Narrabri coal development 2007 – 2010
-
Bulk earthworks aerial shot
-
Box cut mining excavation -
Concrete box cut entry road -
Admin & Bathhouse precast tilt -
Commencement of box cut, access roads & facilities -
Completion of 7km council road upgrade -
25m Crushing plant stacker -
Completed industrial area / development mining equipment -
Completed ROM stacker/ crushing & sizing plant -
Stage 1 - Commissioning of WHC rolling stack -
Bulk earthworks -
Laying 3.6km of 60kg rail on concrete sleepers
Project Description
The management team of KB was appointed to project manage and deliver a major greenfield underground long mine development valued at $520m over a 4-year period. This was a mutli-disciplined project, involving roads, rail, bulk earthworks, civil construction, tunnelling, mechanical conveying/handling and high voltage electrical systems. This project was delivered by over 250 personnel on time and on budget, with no serious injuries or equipment damage recorded. A summary of the project components are listed below:
Details
600,000 m3 box cut bulk excavation, including blasting
20,000 m2 of box cut concrete stabilisation, including installation of mine portal entries
3.6 km balloon loop railway housed in 15 m deep cutting and connected. Included turnouts to the North West rail branch
Construction of 4 of polylined evaporation dams with capacity of 750 ML
Negotiation and construction of 28 km of 66 kV high voltage powerline supply and substations
Raw/fire water reticulation system
Workshop, stores and administration buildings
4500 t/ hr drift conveyor and ROM skyline stackout conveyor system
5500 t/ hr (3 valve) product and precision train loadout facility
3 x 1100 m drifts to intersect coal seam
15 km water supply 4 ML per day pipeline from Namoi River to site
2 ML per day ultra filtration and reverse osmosis plant
6 m diameter, 220 m deep blind bored ventilation shaft
450 m3/ s ventilation fan installation