Celeste Pond - QLD GAS (2014)
-
Bulk earthworks embankment 95% complete -
Bulk earthworks clay lining floor -
Modern GPS guided equipment
-
Modern GPS guided grader - Trimming floor -
Complete subgrade finish -
Complete subgrade for underliner pump system -
Equipment slab - Leak detection -
HDPE liner - Leak detection system -
HDPE liner - Leak detection system -
Swale drain access -
Lining floor & installation of underliner pump sumps -
Underliner pump sump extraction pipes -
Concreting extraction pipe work -
Liner anchor trench preparation
Project Description
In May 2014, KB was awarded the contract for a $4m construction of the Celeste Regional Pond for Queensland. This was the first major QLNG project for the company. The project involved the earthworks and civil construction to complete a 400 megalitre HDPE lined reservoir to contain coal seam gas water. KB was the prime contractor to complete the works, which operated a continuous 7-day week operation, again delivering the works on time and without injury. The major feather to this project was the high level of workmanship and quality standards to achieve client acceptance. KB met these requests and delivered an exceptional product. A summary of the project components are listed below:
Details
Clearing and mulching of the site
Temporary workshop and camp facilities for 30 workers
Bulk earthworks and embankment construction 300,000m3
Surface finish except PE lining work
Minor civil works, concrete / rock spillway
Roadworks and anchor trench
Excavation and backfill
Topsoiling, seeding and security fencing